Town of Dover Highway RFP

Town of Dover Highway RFP

The Town of Dover is requesting bids for the excavation and installation of a 6ft x 14ft x 90 ft. concrete box culvert on Taft Brook Rd.

Work to consist of removal and disposal of existing culvert, excavate and dispose of excavated material, install new 6ft x 14ft x 90 ft. box culvert provided by the contractor. All work will be done according to the plans.

Please click the link below for complete proposal:

Town of Dover Taft Brook rfp.pdf

Bridge Plan documents:

taft brook bridge.zip

Culvert Plan documents:

dover_sheet_1.pdf

dover_sheet_2.pdf

dover_sheet_3.pdf

dover_sheet_4.pdf

dover_sheet_5.pdf

dover_sheet_6.pdf

dover_sheet_7.pdf

Search Dover, VT

You may also be interested in: